Asphalt repairs at Foundation Annex scheduled
On Monday, June 4, workers will repair asphalt in the roadway leading to the Foundation Annex and at two other locations in that area (see map below).
The rear parking lot will be closed for this work between 7 a.m. and 7 p.m. Expect construction equipment and personnel in the area; traffic control will be present as needed.
Remember to approach construction zones with caution.