Temporary sidewalk closure between Lots 11A, 16 scheduled
Beginning at 7 a.m., Wednesday, Aug. 23, through 5 p.m., Wednesday, Aug. 30, the sidewalk between Lot 11A and Lot 16 will be closed temporarily to replace the existing asphalt sidewalk with brick as part of the Student Counseling Center construction project.
Expect barricades, construction equipment and personnel in the area; a detour will route pedestrians along Poplar Terrace Lane.